The holes in the casing are drilled, and the metal and wood sheets are cut, with the holes drilled.
Some of the pieces have to be redrilled because of design misinterpretation and hole misalignment,
but all design problems have been solved.
April 17, 2008
The casing for the satellite is welded. The next step is to sand the outside edges for the sides
to be attached.
April 3, 2008
Some metal sheets are cut, and others are sketched and waiting to be cut. The planning stage
is transforming into preparation for construction.